Description
Aerovironment DC Fast Charge Station

Mid-range networked DC CHAdeMO-compliant fast charge station. This is the station AV is installing as part of the West Coast Green Highway project along the I-5 corridor from California in the south to the Oregon Willamette Valley region in the north.

Models: EV30/50/60-PS, EV30/50/60-FS*

These stations take 480V, 3-phase AC input, maximum input current 64A. Other inputs are available.

Designed for highways, federal and municipal buildings, urban sites, airports, rest stops.

Features

Enclosure: Outdoor-rated
Efficiency: >90%
Duty Cycle Rating: 100%
Charger Shutdown Time: 15 ms

Options

Point-of-Sale
Data management and metering
Networking: Wired and wireless

Specs
1 comment on “Aerovironment DC Fast Charge Station”
  1. Joe Huber says:

    Charging speed is measured in kW, not kWh as shown here.

Leave a Comment

Your email address will not be published. Required fields are marked *